top of page

Working bee Saturday 12th May 2018.

Jobs to do;

  • Dismantle old mens long drop toilet, recover treated posts in screen wall. ( bring spades hammers pliers, )

  • If fine & dry seal holes in 200M mound roof, sealant supplied.

  • Rake up stones 50M range floor and after some leveling has been done rake up stones debris on 300M floor, both jobs to make the areas fit to mow. Bring rakes shovels wheel barrows

  • Make up new target frames, and clean up rubbish. Bring saw, battery drill.

  • Remove heap of dirt by new toilet and use to fill old long drop. I will have trailer on site.

Enquiries contact Malcolm P. 027 625 9608.

Featured Posts
Check back soon
Once posts are published, you’ll see them here.
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
f_logo_RGB-Hex-Blue_512.png
bottom of page